Re-paving of roads in Cabin John Gardens



Recent Announcements

  • NO PARKING schedule for 12/11 - 12/12: Speed Hump Paving To: All CJG MembersNO PARKING schedule for 12/11 – 12/12Speed Hump paving:Ericsson Rd. eastEricsson Rd. west#8 - #10 Webb Rd.#11 - #16 McKay CircleRuston will be on-site Thursday and Friday this week (12/11-12/12) to install speed humps. Parking restrictions are in effect from 7am-5pm, for both sides of Ericsson Rd.Webb Rd. in front of the Community House, and between #11 - #16 McKay Circle.Speed humps span the entire width of the street (except for the concrete gutter). Consequently, in addition to not having vehicles parked in these areas, these roads will be closed to all traffic for short periods of time. Since Ericsson Rd. has speed humps at ...
    Posted Dec 10, 2014, 1:36 PM by Neele Johnston
  • REVISED NO PARKING schedule for 11/25: Paving work on Ericsson (east), Webb, and Russell New Parking Restrictions for Tuesday Nov. 25No Parking from 6am-5pm on:Ericsson Road (east) Webb RoadWebb cars must be moved by 8:30 a.m.Russell RoadRussell cars must be moved by 10:00 a.m.Violators will be towedCommunity House lot will be inaccessible during Webb paving
    Posted Nov 24, 2014, 7:27 PM by Neele Johnston
  • NO PARKING schedule for 11/24 – 11/25 Paving work on Froude, Webb, and Ericsson (east)The drawing below shows the no parking area for 11/24 – 11/25 (Monday and Tuesday) this week.  The road closure is in effect from 6am-5pm.   Ruston will be rolling out the top layer of asphalt paving on all of the east side of CJG as well as Webb Road.  The no-parking area for Monday is shown in red and includes all of Froude Circle. The no-parking area for Tuesday is shown in green and includes the eastern half of Ericsson Road and all of Webb RoadSunday Night / Monday: Residents of Froude Circle should park on Ericsson Road Sunday night, or leave your vehicle parked on the western ...
    Posted Nov 22, 2014, 11:44 AM by Neele Johnston
  • Major Schedule Change -- No Parking instructions for 9/29 - 9/30 All remaining roads in CJG, including the East Side, will get the first layer of asphalt paving this Monday and Tuesday. This is a change from the notice that was sent out Thursday night. No Parking or Driving 7 a.m. – 5 p.m.Please avoid scheduling deliveries Monday and Tuesday if at all possible. Ericsson Road might be closed completely for short periods of time on Tuesday. If your car is parked in the Community House lot, you may leave it there only if you are sure you will not need to get it out between 7 and 5. If you think you may need to get your car out of CJG at some particular time between 7 and ...
    Posted Sep 28, 2014, 6:09 PM by Neele Johnston
  • Paving status update for Friday, September 26 To: All MembersCJG East Side:As planned, soil stabilization was completed on the East side of Ericsson Road today. Today was especially challenging due to the heavier than expected rainfall last night. The Ruston soil stabilization crew was pushed to their limits to get the muck under control. A number of east-side members had a major challenge getting their cars out this morning and up the hill through the deep muck. The extra challenge led to the Ruston crew having to work into the night finishing up the top section of Ericsson, but there was never really a viable option of leaving it until tomorrow. Some members had to find other parking when they returned home and found ...
    Posted Sep 25, 2014, 7:06 PM by Neele Johnston
Showing posts 1 - 5 of 19. View more »